DRIVEN PRECAST PILING

 

Balfour Beatty Ground Engineering

The Company ¤ Capabilities ¤ Office Locations ¤ Enquiries ¤ Careers ¤ Technical Presentations ¤ News ¤ Home


Pontefract (Cadburys Factory)

  • 370 No. 273mm and 323mm piles for rebuild of Cadburys chocolate factory which burnt down (melted).
     

  • Branlow contract with Bovis Lend Lease.
     

  • Originally planned as drilled rock socket piles – but due to rock unexpectedly underlain by unsuitable granular a hybrid solution developed.

  • Drilled through rock  - thereafter close ended steel casing placed, annulus grouted (30 to 40mm) and then bottom driven onto a set at 6m to 8m depth.
     

  • So hybrid solution involving deployment of two rig types

  • Branlow able to provide a solution quickly and economically once problem identified.
     

  • Pile tests indicated 0.6mm settlement at 60 ton – remarkable performance.

Combining competitive pricing with our design experience and comprehensive range of foundation techniques, we offer a unique service from our strategically placed regional offices. We pride ourselves on the efficient delivery of every stage of the project from design to completion, on time and within budget. Our Engineers will investigate a problem, review the limitations and options, recommend what action to take and then ensure that it is implemented effectively. We are always willing to discuss which foundation methods may be appropriate to a particular problem.

 