Branlow Piling successfully overcome difficult ground to
install a retaining wall and bearing piles using Micropiles on a
tight site on Main Street, Gorey, County Wexford, Ireland |
|
| |
 |
|
Edinburgh Park Station Branlow were employed by the Main Contractor Raynesway
Construction (A Balfour Beatty Group Company).
Our works were let on the basis of an agreed maximum price hence
reducing risk exposure to the Client. |
|
| |
 |
|
East Putney Rail Tunnel East
Putney Rail Tunnel TL 250 in 52 hour possessions,
Remedial works to
portal involved stitch piling plus horizontal tie
backs |
|
| |
 |
|
Pontefract (Cadburys
Factory) 370 No.
273mm and 323mm piles for rebuild of Cadburys
chocolate factory which burnt down (melted). |
|
| |
 |
|
Clifton Ford Hotel, Central
London Scope
of works - Auger Bored Piled Retaining Wall and Bearing Piles.
160 No 300mm dia piles
at 450mm centres to form perimeter contiguous piled wall.
100 No
450mm dia piles at
600mm centres to form perimeter contiguous piled wall plus internal
piling to support column loads.
12 No
900mm dia piles
to internal columns positions featuring plunge column reinforcement
sections. Bored length up to 24m. |
|